Boeing Industrial Ventilation Improvement

FSi headed a commissioning team to evaluate several critical wing lay-down tool positions.

Field testing and adjustments verified and established production sequences for cure cycle of the 777 wing. In addition, FSi was involved with corrective design work on the air distribution system for numerous paint applications.

portfolio